manufacturer previous tire recycling line
one period of time EPT
This production line includs major EPT and accessorial tools comma it is used for recycling squander tyre comma the closing item is rubber powder commasteel and fiber interval
two time period Functioning stream of the manufacturing line
Tire ring slicing–tire ring steel separating–strips chopping–blocks reducing– crushing– magnetic metal fiber separator–nylon fiber separator
3 time period Pictures displaying the functioning procedure
3 period1 period of time Ring cutter
Merchandise | Specification |
Motor EPT | five period5 |
Pace of major screw | forty six period8 r solmin |
MAX Diameter of tyre | 1200mm |
Dimension | 1100 ast900 ast1700mm |
Objective colonTo cut the metal ring from the tyre |
3 period2 interval Loop EPT
Item | Specification |
Motor EPT | fifteen KW |
Linear speed of entrance roller | fifteen period5 m solmin |
Ratio of velocity | 1 period1 |
Dimension | 1520 ast1150 ast12101 |
Function colonTo Separate the metal ring from the rubber following 1 phase time period |
3 period3 interval strip cutter
Name | Parameter |
Motor EPT | five period5 |
Disc Diameter | 380 |
Rotate Pace | 18 period4 |
Dimension | 1290 ast870 ast1550 |
Objective colon To cut the aged tire into strip |
3 period4 time period Blocks cutter
Item | Specification |
motor EPT | 11kw |
Pace of major screw | 420 r solmin |
Out diameter of cutter | 200mm |
Dimension | 1130 ast830 ast1100 |
Objective colon To Reduce the strip into block |
four period of time Certification of the generation line and my factory time period Our EPTs handed CE commaBV commaISO commaSGS certification commapls confirm the good quality periodAll our EPTs have one year assure comma will offer lifetime upkeep
Iso9001 colon2008 comma BV comma SGS
five time period We are prepared to give them a turnkey answer comma by planning the line in accordance to their place comma creating all electrical Installation comma h2o installation comma civil basis comma education their people and proving that they will get the targets for manufacturing according to the design and style interval
ten periodOur manufacturing facility located in HangZhou metropolis periodYou can fly to HangZhou liuting airport commathen we can decide you up to our facotry to go to periodWarm welcome visit us